Tag Archives: Scale Drawings

Lineside Details: GSWR Mileposts

Alan O’Rourke

 

Irish railways used a number of methods to mark distances: the symbolic steel sheet squares, diamonds, triangles and arrow-heads of the MGWR were probably the most original design. Other companies used metal, stone or wooden markers. The GSWR used substantial granite mileposts on its original lines, but later, and on the absorbed WLWR routes, used the smaller cast iron patterns shown here.  These diagrams come from drawing in the IRRS archives. I am grateful to the Society for permission to reproduce this and Brendan Pender for his help in accessing the archives.

Quarter-mile marker

Quarter-mile marker

 

Half- and three-quarter-mile posts

Half- and three-quarter-mile posts

Side and front elevations of the top section of a whole mile marker

Side and front elevations of the top section of a whole mile marker

Side and front elevations upright. Height from bottom surface of base plate to lower edge og the numeral plate is 3ft 4.5in

Side and front elevations upright. Height from bottom surface of base plate to lower edge og the numeral plate is 3ft 4.5in

GSWR stone milepost and cast iron quarter milepost, both from near Nenagh

GSWR stone milepost and cast iron quarter milepost, both from near Nenagh

Advertisement

Leave a comment

Filed under Prototype

Scale Drawings – Ballymena & Larne 2-6-0ST

Ballymena & Larne Railway Beyer Peacock 2-6-0ST (originally published in Railways, no. 44, Dec. 1943, page 190

Ballymena & Larne Railway Beyer Peacock 2-6-0ST (originally published in Railways, no. 44, Dec. 1943, page 190

Leave a comment

Filed under Scale Drawings

Station Survey: Abbeyfeale

Alan O’Rourke

 

We have already represented the North Kerry line in this series, but another station  will not come amiss, especially as elevations of the main building are to hand. Abbeyfeale station opened with the rest of the Newcastlewest-Tralee section on Dec. 20th, 1880. The original plan was for a single platform, but by July 1881,  the station was re-modelled with a passing loop and  second platform to make it suitable for crossing passenger trains. The station had a 293’ long down platform  (with a 3,530 gallon water  tank), 224’ up platform, carriage dock, a long shunting road and a crossover from the goods store to the platform road. In 1881, it acquired a Gloucester Carriage & Wagon Company signal cabin. In GSR days, staffing consisted of a station-master, clerk, two signalman, checker, porter and a guard. As with many smaller Irish stations, it really came to life for livestock traffic. Typically, for  Abbeyfeale fairs,  ten wagons were supplied in advance, with a special of another ten to twenty from Limerick about 7am, and a loaded train back to Limerick about 2pm. For bigger fairs, Limerick sent down a special of twenty-five wagons the day before, with the engine stabled at Listowel overnight, and  in the morning, there was a special from Tralee of fifteen  wagons and a buyers’ coach, and for the main Autumn fairs, which might generate three specials, there was an empty train of twenty wagons train from Limerick about 7am in the morning. If anyone wants a narrow gauge feeder, they can employ a little modeller’s licence, and conjecture that one of the numerous still born plans spawned by the 1883 Tramways Act had proved more successful. In 1884, the Abbeyfeale  & Brosna Tramway was promoted to run south from Abbeyfeale, with baronial guarantees from Glenquin in Limerick and Trughenacmy in Kerry, and in 1885 the Limerick & Kerry Light Railways and Tramway Company, prepared Bills for both Abbeyfeale-Brosna and Listowel-Ballybunion schemes. None of these ideas seems to have progressed beyond the planning stage.

The broad gauge line lost its passenger services in 1963, and Abbeyfeale closed to all traffic in November 1975, but the building is well maintained as a private residence with the water tower and platforms intact. The goods store still stands but when I walked through in 2002 was  labelled “dangerous” and the roof was beginning to decay. The town lies to the south. At the west (Tralee) end of the station, the line crossed the road north to Athea by a girder bridge, and then ran along an embankment, to cross the Oolagh River by a steel girder bridge with 40’ span,  which could provide some scope for scenic modelling, and where open-plan baseboards might help.

Details of North Kerry line locomotives, rolling stock and timetables were given in New Irish Lines, Nov, 2000. There are photographs in the O’Dea Collection in the National Photographic Archive of Ireland and Adrian Vaughan’s collection.

Abbeyfeale station above as opened, below as modified to be suitable for passing passenger trains, 1881: later additional trackwork shewn in broken lines. Line to Limerick and Newcastlewest to left of both drawings; line to Tralee to right.

Abbeyfeale station above as opened, below as modified to be suitable for passing passenger trains, 1881: later additional trackwork shewn in broken lines. Line to Limerick and Newcastlewest to left of both drawings; line to Tralee to right.

Platform Elevation

Platform Elevation

Floor Plan

Floor Plan

Section A-B

Section A-B

Bedroom Level

Bedroom Level

The elevation, plan and section are from GSWR 8″:1′ scale architectural drawings, courtesy of the IRRS. 

 

Leave a comment

Filed under Prototype, Scale Drawings, Site Surveys

GNR Hopper Wagons and Plough Vans

Alan O’Rourke

 

Until the end of the 19th century, the typical ballast wagon was a primitive short wheelbase vehicle, with low drop sides, leather flaps to try and keep the stone dust out of the grease-axle boxes and, possibly still, dumb-buffers. To go with these, there might be a “ballast brake van,” often derived from an even older four-wheel coach, and sometimes a sort of combined tool shed and mess hut on wheels. But, from the 1890’s, a number of companies, including in Ireland, the GSWR, MGWR and GNR(I), started to modernise their permanent way stock, introducing higher capacity steel hoppers, where instead of shovelling the ballast out of low-side wagons, it could be deposited directly onto the track through bottom doors, and also “plough vans” with steel shears underneath, which at least started the process of distributing the gravel. These drawings show the GNR designs of the period, and a very similar, but later, design for gypsum traffic. The plough vans and eighteen hoppers came from Hurst Neilson & Co. of Motherwell, and were of all-steel construction. The ballast wagons had self-discharging hoppers, which could be operated by screw mechanisms from either side.  The van had double plough-shears between the wheels, so it could operate running in either direction, a large veranda and a covered portion with stove and lockers. All this stock had vacuum and hand brakes, and oil axle-boxes. An unusual, and it seems only experimental change was the use of “GNR(I)” lettering, instead of the more usual “GNR” and later “GN,” although since this only appears on the Neilson maker’s photos, it may have been their whim, and rapidly replaced by the orthodox legend on arrival at Dundalk. Similarly, although the posed official shot shows the van running as number 120, the GNR drawing lists them as 8166 and 8167, both built in 1910, and costing £242 each. Similarly, the Neilson hoppers, all built in 1910 at £138 each, had running numbers  8097-8114. Another nine hoppers came from Pickering in 1912, at £149 each, running as 8139-8147.

GNR ballast hopper 149, a Pickering makers photo (Photo: Historical Model Railway Society Collection, no. W1007)

GNR ballast hopper 149, a Pickering maker's photo (Photo: Historical Model Railway Society Collection, no. W1007)

GNR(I) Ballast Plough & Brake Van

GNR(I) Ballast Plough & Brake Van.

At the dissolution of the GNR, UTA got fourteen of the hopper vehicles, and the remaining thirteen went to CIE, for which the following details are recorded:

GNR No: Tare (Tons-CWT-Quarters): Date brake gear altered to take standard CIE KD block:
8098
8100
8102
8104
8106
8108
8110
8112
8114
8140

7-14-0
7-10-3
7-12-2
7-17-1

7-13-1
8-2-3
7-14-3
1962
1962
1962
1961
1962
1962
1961
1962
1962
1960

 

GNR(I) 20 Ton Hopper Ballast Wagon

GNR(I) 20 Ton Hopper Ballast Wagon

 

GNR ballast plough van no. 120, a Neilson makers photo (Photo: The Locomotive Magazine & Railway Carraige & Wagon Review, January 14th 1911)

GNR ballast plough van no. 120, a Neilson maker's photo (Photo: The Locomotive Magazine & Railway Carraige & Wagon Review, January 14th 1911)

 

GNR ballast hopper no. 107, a Nielson makers photo, showing GNR(I) lettering (Photo: The Locomotive Magazine & Railway Carraige & Wagon Review, January 14th 1911)

GNR ballast hopper no. 107, a Nielson maker's photo, showing "GNR(I)" lettering (Photo: The Locomotive Magazine & Railway Carraige & Wagon Review, January 14th 1911)

The gypsum hopper drawing does not have any notes about outside builders so I assume they represent Dundalk’s adaptation of the earlier ballast hoppers. Six of these were turned out in the Second World War (or did the GNR call it the Emergency, or like the Church of Ireland prayer book for “our leaders” have different rubric for each side of the Border?).  I am assuming that these worked from Kingscourt on the MGWR, being handed over at Navan and forwarded on GNR trains to Drogheda cement factory. These vehicles were built with hand brakes only but cost had risen to £477 each (£205 wages, £235 material, £37 other charges), and the following details apply:

No: Date: Tare: Brakes Altered: Brake Screw Protection Plates Fitted:
6015
6016
6017
6018
6019
6020
Oct. 1944
Oct. 1944
Oct. 1944
Nov. 1944
Nov. 1944
Nov. 1944
8-1-1
8-1-3
8-2-0
8-2-0
8-1-3
8-1-3
Nov. 1945
Oct. 1945
Oct. 1945
Oct. 1945
Oct. 1945
Nov. 1945
Apr. 1946
Apr. 1946
May 1946


 

GNR(I) 20 Ton Hopper Wagon (Gypsum Traffic)

GNR(I) 20 Ton Hopper Wagon (Gypsum Traffic)

 

 

Reference: Anonymous (1911) New Rolling stock. Great Northern Ry. (Ireland) The Locomotive Magazine & Railway Carriage & Wagon Review 17: 22 (January 14, 1911).

I am grateful to the IRRS archives and Mr Brendan Pender for access to the GNR drawings and permission to reproduce them.

1 Comment

Filed under Prototype, Scale Drawings

Lineside Details: GSR and CIE Tubular Post Signals

Alan O’Rourke

 

The traditional material for signal posts was either wood or steel lattice.  However, from the 1930s onwards, several companies tried more modern ideas, typically tubular steel, and these diagrams show the CIE design, including new light-weight metal arms, as opposed to the traditional wood design, with a heavy cast iron frame for the spectacle glasses.  The design may go back to GSR days; the late William South told me he saw the first of these designs of semaphores in the Limerick area in 1938.  The design had numerous variants depending on function and position, with differing heights to suit sighting and clearance, and including brackets, junctions and signals to protect level crossings.  Until recently, these tubular post designs, gradually replacing the older wooden post signals were a ubiquitous part of the Irish railway scene, but with the spread of colour light signalling, they have become something of an endangered species themselves in the last few years.

Diagram #1: GSR/CIE tubular post signal (distant)

Diagram #1: GSR/CIE tubular post signal (distant)

Diagram #2: GSR/CIE tubular post signal (home)

Diagram #2: GSR/CIE tubular post signal (home)

Diagram #3: GSR/CIE tubular post signal

Diagram #3: GSR/CIE tubular post signal

Diagram #4: GSR/CIE tubular post signal

Diagram #4: GSR/CIE tubular post signal

Diagram #5: GSR/CIE tubular post signal

Diagram #5: GSR/CIE tubular post signal

 

I am grateful to the IRRS archives and Mr Brendan Pender for access to the CIE drawings, which seem to date from about 1956, and permission to reproduce them.

Leave a comment

Filed under Prototype, Scale Drawings